Bathroom Projects

Repair and Overhaul

6337-bathroom
6337-bathroom-110-demo-1

Phase 1 – General demo

6337-bathroom-101-rot-2-1

Phase 1 – Rot repair

6337-bathroom-115-first-floor

Phase 1 – Installation of new gray tile

6337-bathroom-118-shower-door

Phase 2 – Original shower door

6337-bathroom-119-fiberglass

Phase 2 – Fiberglass surround

6337-bathroom-130-insert-removed

Phase 2 – Mildew behind fiberglass

6337-bathroom-135-raised-shower-head

Phase 2 – Shower head raised by 6″ and niche was added

6337-bathroom-140-shower-cement-board

Phase 2 – Cement board installed

6337-bathroom-150-redguard

Phase 2 – RedGard waterproofing applied

6337-bathroom-170-shower-tile

Phase 2 – 12×24″ ceramic tiles installed

6337-bathroom-179-floor-demo

Change Order by Client – Removed previously installed gray tiles (they made space too dark)

6337-bathroom-180-heated-floor

Change Order by Client – Brighter tile pattern chosen and Ditra heat installed under tile

6337-bathroom-190-floor

Change Order by Client – New floor tile completed

6337-bathroom-201-wall-tile-2

Change Order by Client – Extended the backsplash around sink into a tiled half-wall feature

6337-bathroom 6337-bathroom-110-demo-1 6337-bathroom-101-rot-2-1 6337-bathroom-115-first-floor 6337-bathroom-118-shower-door 6337-bathroom-119-fiberglass 6337-bathroom-130-insert-removed 6337-bathroom-135-raised-shower-head 6337-bathroom-140-shower-cement-board 6337-bathroom-150-redguard 6337-bathroom-170-shower-tile 6337-bathroom-179-floor-demo 6337-bathroom-180-heated-floor 6337-bathroom-190-floor 6337-bathroom-201-wall-tile-2

Tile Installation and Finish work

Cruv-bathroom-240-finished-bathroom
Cruv-bathroom-100-start

Structural build-out already complete

Cruv-bathroom-220-window-finished

Window waterproofing complete

Cruv-bathroom-101-start-window

Window needs to be waterproofed

Cruv-bathroom-210-sink-backsplash

Matching backsplash added around sink

Cruv-bathroom-230-linear-drain-finished

Linear drain complete

Cruv-bathroom-129-niche

Added niche

Cruv-bathroom-110-added-niche

RedGard waterproofing

Cruv-bathroom-120-partial-tile-lower

Installation progress

Cruv-bathroom-121-partial-tile-upper

Installation progress

Cruv-bathroom-130-niche

Niche installed

Cruv-bathroom-140-partial-window

Window detail

Cruv-bathroom-150-floor

Shower floor tile

Cruv-bathroom-160-bottom-tiles

Installation progress

Cruv-bathroom-161-bottom-tiles

Installation progress

Cruv-bathroom-170-top-tiles

Installation progress

Cruv-bathroom-180-start-linear-drain

Linear drain pieces laid out

Cruv-bathroom-190-partial-floor

Installation progress

Cruv-bathroom-191-partial-floor

Installation progress

Cruv-bathroom-200-shower-progress

Installation progress

Cruv-bathroom-250-door-trim

Door trimmed

Cruv-bathroom-251-door-trim

Door cut to new height of flooring and reinstalled; trim added around door jamb

Cruv-bathroom-240-finished-bathroom Cruv-bathroom-100-start Cruv-bathroom-220-window-finished Cruv-bathroom-101-start-window Cruv-bathroom-210-sink-backsplash Cruv-bathroom-230-linear-drain-finished Cruv-bathroom-129-niche Cruv-bathroom-110-added-niche Cruv-bathroom-120-partial-tile-lower Cruv-bathroom-121-partial-tile-upper Cruv-bathroom-130-niche Cruv-bathroom-140-partial-window Cruv-bathroom-150-floor Cruv-bathroom-160-bottom-tiles Cruv-bathroom-161-bottom-tiles Cruv-bathroom-170-top-tiles Cruv-bathroom-180-start-linear-drain Cruv-bathroom-190-partial-floor Cruv-bathroom-191-partial-floor Cruv-bathroom-200-shower-progress Cruv-bathroom-250-door-trim Cruv-bathroom-251-door-trim

Small addition to basement

Ktn-bathroom-160-final

Client added shower fixtures later

Ktn-bathroom-100-start

Converted small 3′ x 3’6″ closet space into a shower

Ktn-bathroom-110-niche-and-drain

Installed Schluter niche and drain

Ktn-bathroom-120-membrane

Using Schluter Shower System (lifetime manufacturer warranty)

Ktn-bathroom-130-floor

Floor tile and curb installed

Ktn-bathroom-140-partial-walls

Installation progress

Ktn-bathroom-150-partial-niches

Installation progress

Ktn-bathroom-160-final Ktn-bathroom-100-start Ktn-bathroom-110-niche-and-drain Ktn-bathroom-120-membrane Ktn-bathroom-130-floor Ktn-bathroom-140-partial-walls Ktn-bathroom-150-partial-niches

Tub Surround

Sac2-bathroom-150-final-1
Sac2-bathroom-100-start

Old and tired

Sac2-bathroom-110-no-drywall

Removed sheetrock to access plumbing

Sac2-bathroom-120-cement-board

Installed cement backer board

Sac2-bathroom-130-redgard

RedGard waterproofing

Sac2-bathroom-139-partial-tile

Installation progress

Sac2-bathroom-140-tile

Installation complete

Sac2-bathroom-150-final-1 Sac2-bathroom-100-start Sac2-bathroom-110-no-drywall Sac2-bathroom-120-cement-board Sac2-bathroom-130-redgard Sac2-bathroom-139-partial-tile Sac2-bathroom-140-tile

En Suite

Sac-bathroom-240-glass-installed

Shower glass freshly installed

Sac-bathroom-230-tub

Tub installed

Sac-bathroom-200-linear-drain-finished

Linear drain installed

Sac-bathroom-100-start

Standup shower is old, tired, and too small

Sac-bathroom-101-start

Jetted tub already removed due to a prior leak

Sac-bathroom-120-demo

Demo complete

Sac-bathroom-131-preslope

Enlarged walk-in space; ready for pre-slope shower pan

Sac-bathroom-140-fresh-pan

Old-school shower pan is set; base of linear drain is installed

Sac-bathroom-150-cement-board

Cement backer board installed; second shower controller added

Sac-bathroom-160-partial-tile

Installation progress

Sac-bathroom-170-linear-drain-layout

Linear drain pieces cut and laid out

Sac-bathroom-180-tub-space

Tile cut for in-wall plumbing under window

Sac-bathroom-190-all-tile

Installation progress

Sac-bathroom-210-curb

Shower curb complete

Sac-bathroom-220-tub-space-finished

Tub space complete

Sac-bathroom-240-glass-installed Sac-bathroom-230-tub Sac-bathroom-200-linear-drain-finished Sac-bathroom-100-start Sac-bathroom-101-start Sac-bathroom-120-demo Sac-bathroom-131-preslope Sac-bathroom-140-fresh-pan Sac-bathroom-150-cement-board Sac-bathroom-160-partial-tile Sac-bathroom-170-linear-drain-layout Sac-bathroom-180-tub-space Sac-bathroom-190-all-tile Sac-bathroom-210-curb Sac-bathroom-220-tub-space-finished

Get In Touch

Ready to transform your space? Contact us today for a consultation!