Bathroom Projects
Repair and Overhaul
Phase 1 – General demo
Phase 1 – Rot repair
Phase 1 – Installation of new gray tile
Phase 2 – Original shower door
Phase 2 – Fiberglass surround
Phase 2 – Mildew behind fiberglass
Phase 2 – Shower head raised by 6″ and niche was added
Phase 2 – Cement board installed
Phase 2 – RedGard waterproofing applied
Phase 2 – 12×24″ ceramic tiles installed
Change Order by Client – Removed previously installed gray tiles (they made space too dark)
Change Order by Client – Brighter tile pattern chosen and Ditra heat installed under tile
Change Order by Client – New floor tile completed
Change Order by Client – Extended the backsplash around sink into a tiled half-wall feature
Tile Installation and Finish work
Structural build-out already complete
Window waterproofing complete
Window needs to be waterproofed
Matching backsplash added around sink
Linear drain complete
Added niche
RedGard waterproofing
Installation progress
Installation progress
Niche installed
Window detail
Shower floor tile
Installation progress
Installation progress
Installation progress
Linear drain pieces laid out
Installation progress
Installation progress
Installation progress
Door trimmed
Door cut to new height of flooring and reinstalled; trim added around door jamb
Small addition to basement
Client added shower fixtures later
Converted small 3′ x 3’6″ closet space into a shower
Installed Schluter niche and drain
Using Schluter Shower System (lifetime manufacturer warranty)
Floor tile and curb installed
Installation progress
Installation progress
Tub Surround
Old and tired
Removed sheetrock to access plumbing
Installed cement backer board
RedGard waterproofing
Installation progress
Installation complete
En Suite
Shower glass freshly installed
Tub installed
Linear drain installed
Standup shower is old, tired, and too small
Jetted tub already removed due to a prior leak
Demo complete
Enlarged walk-in space; ready for pre-slope shower pan
Old-school shower pan is set; base of linear drain is installed
Cement backer board installed; second shower controller added
Installation progress
Linear drain pieces cut and laid out
Tile cut for in-wall plumbing under window
Installation progress
Shower curb complete
Tub space complete